Sea Ray Drive Water Transmission Main Relocation at Sykes Creek

The existing 36-inch water transmission main along Sea Ray Drive in Merritt Island conveys potable water to east Merritt Island and beachside customers by crossing Sykes Creek. Originally installed on the bridge above the creek, the water main is being relocated to a subaqueous crossing of the creek due to bridge renovations.

Status Design
Design Start October 2021
Design Completion September 2022
Construction Start FY 2023
Construction Completion FY 2023
Spent Budget $137,779
Total Budget (Design only) $305,867
Percent Construction Complete 0%
                                                                                                                                                                  Statistics as of July 2022