Installing approximately 2900 linear feet of 16" ductile iron (DI) pipe along Michigan Ave (from Clearlake Rd to US1). The existing pipeline along US1 acts as a single point of failure in the City's collection system. After an analysis of the wastewater collection system, through a hydraulic model, a deficiency in this section was revealed. This can be resolved through this pipeline, creating a circular flow path.